Design Consultant: NWP

We were commissioned by Core Utility Solutions to design and build the electrical LV rising and lateral mains infrastructure for the entire Paradise Street project. This involved working closely with Core and Scottish Power engineers along with the architects and M&E consultants. The Paradise Project is a large retail-led mixed use development with areas of varying character both in terms of scale and use. Six districts, each having its own distinctive character.


< Back to Case Studies

"Working with NWP was really great. They understood our client’s needs & how best to achieve them. We were given options of suppliers with cost-effective brands that achieved the desired look. The site team were hands on & always within reach by phone or email."
Nicolas Khalili, Managing Director – HWO Architects