Tel: 01745 351 351

News

Walworth Road

NWP Electrical & Mechanical have completed all works at the Walworth Road apartment development in Elephant & castle, London.

Working with Main Contractor C Fields, NWP have achieved completion on all 72 apartments across two blocks.

The central plantroom within block A housed the cold-water storage tank & boiler plant to supply domestic cold water to each apartment, the boiler feeds each apartments heat interface unit, in turn feeding each apartment heating & hot water demand.

Photovoltaic panels are installed onto the roof of both blocks to offset a portion of the electricity demand of the development.

The installed as part of the block A development is the Living Wall with automatic irrigation system fed via a category 5 break tank within the plantroom.

In addition to the 72 apartments a further ‘freehold’ studio apartment was completed.


< Back to News

"Working with NWP was really great. They understood our client’s needs & how best to achieve them. We were given options of suppliers with cost-effective brands that achieved the desired look. The site team were hands on & always within reach by phone or email."
Nicolas Khalili, Managing Director – HWO Architects